{"id":138,"date":"2011-08-15T13:09:00","date_gmt":"2011-08-15T13:09:00","guid":{"rendered":"https:\/\/oresund-strandpark.dk\/etape5\/?post_type=referat&#038;p=138"},"modified":"2022-09-28T13:10:09","modified_gmt":"2022-09-28T13:10:09","slug":"bestyrelsesmode-67","status":"publish","type":"referat","link":"https:\/\/oresund-strandpark.dk\/etape5\/referater\/bestyrelsesmode-67\/","title":{"rendered":"Bestyrelsesm\u00f8de"},"content":{"rendered":"\n<p>Til stede: Flemming S\u00f8rensen (FS), Arne Jensen (AJ), Thorkild Lykke (TL), Peter Nyholm Jensen (PNJ), Hanne J\u00f8rgensen (HJ), Bodil S\u00f8rensen (BS), Pernille Poulsen (PP) (ref.).<\/p>\n\n\n\n<p><strong>Referat<br><\/strong><strong><br>1.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Godkendelse af referat fra sidste bestyrelsesm\u00f8de<\/strong><\/p>\n\n\n\n<p>Referat godkendt.<\/p>\n\n\n\n<p><strong>2.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Orientering<\/strong><\/p>\n\n\n\n<ul><li>R\u00f8glemme i opgang 7 kan ikke lukke. H\u00e5ndv\u00e6rker er rekvireret.<\/li><li>Logic Air har udf\u00f8rt kontrol af ventilationssystem. 1 motor i blok 9 skal repareres, pris ca. 15.000 kr.<\/li><li>Vand i teknik skab opgang 7. TL observerer og orienterer Skanska, s\u00e5fremt det gentager sig.<\/li><li>Otis tilkaldeaftale. FS har meddelt Otis at AJ og FS + Jimmi\/Kenneth, Sundby Reng\u00f8ring har ret til at tilkalde Otis ved fejl p\u00e5 elevatorer.<\/li><\/ul>\n\n\n\n<p>&nbsp;<strong>3.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Nyt fra grundejerforeningen<\/strong><\/p>\n\n\n\n<ul><li>Parkering&nbsp;<\/li><\/ul>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Det er godkendt at parkering kan ske efter 5 m fra adgangsvejen \u2013 dvs. at der ikke l\u00e6ngere udstedes parkeringsafgifter ved parkering efter 5 m.&nbsp;<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; M\u00e6rkning vil blive foretaget af Parkzone.<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Handicapafm\u00e6rkninger bliver fjernet.<\/p>\n\n\n\n<ul><li>Muligheder for fartd\u00e6mpning bliver fortsat unders\u00f8gt.<\/li><li>Den lille milj\u00f8station er opf\u00f8rt inden der er opn\u00e5et midlertidig dispensation<\/li><\/ul>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Der er indkommet 3 indsigelser fra blok 8.<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Der er bestilt ekstra flaskecontainer.<\/p>\n\n\n\n<ul><li>Fortov \u2013 intet nyt at berette.<\/li><\/ul>\n\n\n\n<p><strong>4.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>\u00d8konomi<\/strong><\/p>\n\n\n\n<p>Gennemgang af budgetkontrol for 1. halv\u00e5r 2011 udsat til n\u00e6ste m\u00f8de.<\/p>\n\n\n\n<p><strong>5.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Cykelparkering<\/strong><\/p>\n\n\n\n<ul><li>Afventer igangs\u00e6tning ved blok 10.<\/li><li>L\u00e5ger i cykelskure is\u00e6ttes i l\u00f8bet af 4 \u2013 5 uger.<\/li><li>AJ indk\u00f8ber spade og flytter roser.<\/li><li>Forslag om at udvide cykelparkeringen for enden af blok 9 ved Strandvejen vurderes og tages op til n\u00e6ste \u00e5r.<\/li><\/ul>\n\n\n\n<p><strong>6.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Oprydning<\/strong><\/p>\n\n\n\n<ul><li>Dato for oprydning i opgange og p\u00e5 f\u00e6llesareal i k\u00e6lderen fastl\u00e6gges p\u00e5 n\u00e6ste m\u00f8de.<\/li><li>Input til oprydningsopslag sendes til PP.<\/li><li>Udkast til opslag udarbejdes til n\u00e6ste m\u00f8de (PP).<\/li><li>Cykler og barnevogne h\u00e5ndteres separat (afventer at d\u00f8re er p\u00e5 plads i cykelskurene).<\/li><li>K\u00e6lder h\u00e5ndteres separat.<\/li><\/ul>\n\n\n\n<p><strong>7.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Reng\u00f8ring<\/strong><\/p>\n\n\n\n<ul><li>AJ f\u00f8lger op p\u00e5 udf\u00f8relse af reng\u00f8ringen uge for uge.<\/li><li>\u00d8vrige opgange m\u00e5 orientere AJ s\u00e5fremt reng\u00f8ringen ikke er tilfredsstillende.<\/li><li>Ifm konkret manglende reng\u00f8ring er der truffet aftale om kompensation ved gratis polering af gulve.<\/li><li>FL svarer B. Stampe p\u00e5 sp\u00f8rgsm\u00e5l om opsamling af affald udend\u00f8rs<\/li><\/ul>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Affald udend\u00f8rs skal opsamles hver mandag.&nbsp;<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Det er n\u00f8dvendigt at holde \u00f8je med at det sker.&nbsp;<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; FL orienteres s\u00e5fremt det ikke sker.<\/p>\n\n\n\n<p>&#8211;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; FL pr\u00e6ciserer aftalen overfor Jimmi, Sundby Reng\u00f8ring p\u00e5 mail.<\/p>\n\n\n\n<p><strong>8.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Elevatorer<\/strong><\/p>\n\n\n\n<ul><li>Serviceaftale med Otis, pris ca. 15.000 pr. kvartal \u2013 eksklusive tilkald og reparationer<\/li><li>Ved fejlmeldinger er det Sundby Reng\u00f8rings ansvar at f\u00f8lge sagen til d\u00f8rs, &#8211; dvs.:<ul><li>sikre at reparation bliver udf\u00f8rt&nbsp;<\/li><li>sikre at der sker tilbagemelding til anmelder om, at fejl er udbedret<\/li><\/ul><\/li><li>FL pr\u00e6ciserer procedure overfor Jimmi, Sundby Reng\u00f8ring p\u00e5 mail.<\/li><li>Regninger tjekkes mhp at sikre overblik over, hvad det er vi betaler for.<\/li><li>Regninger p\u00e5 reparationer efter lynnedslag sendes via Dan Ejendomme A\/S til forsikringsselskab.<\/li><\/ul>\n\n\n\n<p><strong>9.&nbsp;&nbsp;&nbsp;&nbsp;<\/strong><strong>Badev\u00e6relsesagen<\/strong><\/p>\n\n\n\n<ul><li>AJ og Susanne Nors har deltaget i m\u00f8de vedr. Syn &amp; Sk\u00f8n ifm badev\u00e6relsessagen.<\/li><li>Der er forventning om at der kommer skred i sagen.<\/li><\/ul>\n\n\n\n<p><strong>10.<\/strong><strong>Sommerfest<\/strong><\/p>\n\n\n\n<ul><li>Gennemf\u00f8res trods beskeden tilmelding.<\/li><\/ul>\n\n\n\n<p><strong>11.<\/strong><strong>N\u00e6ste m\u00f8de<\/strong><\/p>\n\n\n\n<ul><li>24. oktober hos TL nr. 7, 4. sal kl. 19.00.<\/li><\/ul>\n\n\n\n<p><strong>12.<\/strong><strong>Eventuelt<\/strong><\/p>\n\n\n\n<ul><li>Bestyrelsesmiddag 7. november.<\/li><li>F\u00e6llesrum bag trappen i opgang 4 anvendes af bestyrelsen til opbevaring af diverse effekter.<\/li><li>Huller bag indbyggede skabe er ikke afsk\u00e6rmet \u2013 evt. mangel v. 5 \u00e5rs gennemgang.<\/li><li>Markiser. Det pr\u00e6ciseres, at der ikke i henhold til ejerforeningens husorden m\u00e5 ops\u00e6ttes markiser.<strong>&nbsp;<\/strong><\/li><\/ul>\n","protected":false},"author":2,"template":"","acf":[],"_links":{"self":[{"href":"https:\/\/oresund-strandpark.dk\/etape5\/wp-json\/wp\/v2\/referat\/138"}],"collection":[{"href":"https:\/\/oresund-strandpark.dk\/etape5\/wp-json\/wp\/v2\/referat"}],"about":[{"href":"https:\/\/oresund-strandpark.dk\/etape5\/wp-json\/wp\/v2\/types\/referat"}],"author":[{"embeddable":true,"href":"https:\/\/oresund-strandpark.dk\/etape5\/wp-json\/wp\/v2\/users\/2"}],"wp:attachment":[{"href":"https:\/\/oresund-strandpark.dk\/etape5\/wp-json\/wp\/v2\/media?parent=138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}